Rulebook 060/18 · Montenegro
Six provisions decide whether an apartment will be quiet. Five of them apply today. The sixth is not applied.
Article 5
30 dBA at night, 40 dBA by day
Equivalent level LAeq in the habitable rooms of an apartment — with the windows closed. Covers noise from sources inside the building and from the outdoor environment.
Article 6
Limit values for element insulation
Minimum values for R'w or DnT,w for airborne sound and maximum values for L'n,w for impact sound — tables 2 to 8 in Annex 1. A very noisy plant room must not adjoin an apartment.
Article 7
Noise protection report
Calculations are made at the technical documentation stage and the results presented in a separate document that forms part of the design.
Articles 8 and 9
Calculation to MEST EN 12354
Three categories: between rooms, façade, services noise. Airborne — 12354-1, impact — 12354-2, external elements — 12354-3. The building is calculated, not the single wall.
Article 10
Noise from building services
Measures to reduce noise generated by building equipment must be provided for already in the documentation — both in the rooms and in the environment around the building.
Article 12 + Article 14
Measurement — suspended
Sound insulation is measured to the standards in Annex 2. But Article 14 postpones the application of Article 12 to the day Montenegro accedes to the EU.
The conclusion from these six points: in Montenegro today the calculation of acoustics at the design stage is mandatory, but verification by measurement of the finished building is not. That is why the noise protection report is the only document that says anything about the noise in your future apartment. This is our conclusion from comparing Articles 7 and 14, not a quotation from the rulebook.
Source: "Pravilnik o tehničkim zahtjevima za zvučnu zaštitu zgrade od buke", Official Gazette of Montenegro no. 060/18 of 07.09.2018; adopted under Article 72 paragraph 2 of the Law on Spatial Planning and Construction of Structures. Article 14 verbatim: "Odredbe člana 12 ovog pravilnika, primjenjivaće se od dana pristupanja Crne Gore Evropskoj uniji".
Night limits · Montenegro
On the left, the acoustic zones and the level permitted outdoors at night. Below, the limit inside a habitable room. The gap between the two numbers is the work the façade has to do.
The difference, worked out. Plot in a residential zone: 45 dB permitted outside at night, 30 dBA required inside — the façade must cut 15 dB. Plot in a road traffic zone: 55 outside, the same 30 inside — the façade must already cut 25 dB. Different windows, different installation, different price, for an outwardly identical apartment.
The decibel scale is logarithmic: every 10 dB means roughly a doubling of perceived loudness, not an increase of a third. The 10 dB gap between the residential and the traffic zone therefore means a night twice as loud, not "slightly louder".
Sources: outdoor zones — "Pravilnik o graničnim vrijednostima buke u životnoj sredini…", Official Gazette of Montenegro no. 060/11 of 16.12.2011, amended by no. 094/21 of 03.09.2021. Indoor limit — "Pravilnik o tehničkim zahtjevima za zvučnu zaštitu zgrade od buke", Official Gazette of Montenegro no. 060/18, Article 5. Setting the two rules side by side and working out the difference is ours; the documents themselves do not do it, because the outdoor and indoor limits sit in different legal acts.
Five paths and no sixth
If an apartment is loud, it is always down to one of five paths. Four of them are settled before the building exists and can barely be corrected after handover.
| Path | Quantity | What solves the problem | After buying |
|---|---|---|---|
| Through the wall from the neighbourvoices, TV, music | R'w larger is better | Mass and multi-layer construction of the party wall. The enemy is anything passing straight through: a socket directly opposite the neighbour's undoes the wall. | partly |
| Through the slab from abovefootsteps, chair, ball | L'n,w smaller is better | A floating screed on impact sound insulation that does not touch the walls at the perimeter. One point of contact and the whole floating floor stops working. | no |
| Around, via adjoining elementsflanking transmission | the prime in R'w covered by the rule | Separation joints and decoupling at the junctions. Because of this path, the wall's catalogue Rw is not what you will hear. | no |
| Through the façade from the streetstreet, promenade | MEST EN 12354-3 façade calculation | Window class, quality of installation, tightness of the joint. Works only with the window closed — hence the requirement on ventilation. | yes |
| From building serviceslift, pump, fan | Article 10 measures in the design | Vibration isolation of equipment, flexible connections on pipework, moving noisy plant out from under habitable rooms. | no |
The rule worth remembering before the deal: everything inside your apartment can be repaired for money; everything in the structure of the building or at the neighbour's cannot. That is why the question about the floating screed is asked before signing the contract, not after moving in.
Symbols and requirements: "Pravilnik o tehničkim zahtjevima za zvučnu zaštitu zgrade od buke", Official Gazette of Montenegro no. 060/18 — Article 4 (definitions of R', R'w, DnT,w, L'n, L'n,w), Article 6 (limit values), Article 9 (calculation to MEST EN 12354-1, -2, -3), Article 10 (services). The "fixable / unfixable" split and the grouping of the paths are ours; the rulebook contains no such classification.