free consultation
Leave a request for a free consultation
Fill in the fields below and we will contact you

Power, Water and Renovation: What to Set Up After Buying an Apartment in Montenegro

The keys are in your hand, the title is registered in the cadastre — and that's when the second, far less romantic part of moving in begins. The electricity meter is still registered to the previous owner. The water utility has no idea a new owner exists. If you want to move a wall or replace the flooring, it turns out some work can start right away and some can't — not without a piece of paper nobody warns you about in advance. And there's a separate question: where do you find a contractor you can actually trust, and how do you tell a licensed professional from someone with a drill and a business card? We went through each of these points and kept only what is backed by an official regulation, a law, or the organizations' own websites — no guesswork, and no “usually” without a source.

Author: Oleg Razumnov
Founder and Director of Construction, Zen Gardens
We're often asked the same question: what to tackle first right after getting the keys — the meters, the renovation, or the internet? The order is usually simpler than it looks, once you know the exact deadlines.
20.09.2026
·
16 min read

Short answer: what to remember

Electricity is transferred to the new owner under the official regulation of the energy regulator Regagen: the application must be filed within 15 days of the change of ownership, accompanied by proof of title and an identity document, and the meter reading at the time of the request becomes the new owner's starting point¹. The water utility has its own, shorter deadline — 7 days — and until the change is registered, the obligation to pay formally remains with the previous owner³. Renovation is more complicated: some work — adaptation, replacing building systems without touching load-bearing structures — doesn't require a permit at all, only a simple notification to the inspector, and the law explicitly treats this adaptation as a separate, lighter category⁴. Work that changes load-bearing elements or increases the building's volume, on the other hand, is classified by law as reconstruction and requires the same permit as new construction⁴. Licensing of the tradespeople themselves in Montenegro currently works differently than in Germany or Austria: there is no mandatory state license for residential renovation work, and the German-style "master craftsman exam" run through the Chamber of Crafts is voluntary⁷. And specifically for a Serbian audience: a work permit for Serbian citizens in Montenegro is issued under the same rules as for any other foreigner — we found no special exception¹¹ — so a Serbian speaker's real practical advantage here isn't in labor law, it's in language: the ability to read the contract and negotiate directly with a contractor.

Key figures and deadlines
15 days
Electricity
The application to transfer the meter must be filed within 15 days of the change of ownership — per the energy regulator Regagen's rules.
7 days
Water
The water utility's deadline is shorter: 7 days to file the ownership-change request, or the previous owner formally remains liable for payment.
7 days
Inspector's response
That's how long a building inspector has to decide whether a reported adaptation is actually a reconstruction requiring a full permit.
€40
Written-estimate threshold
Above this amount, consumer-protection law requires a tradesperson to issue a written offer describing the work and materials.

Electricity: how to transfer the meter into your name

Formally, the procedure for transferring electricity in Montenegro is governed not just by EPCG (Elektroprivreda Crne Gore) itself, but by a document from the energy market regulator Regagen — “Opšti uslovi za snabdijevanje električnom energijom” (General Terms for Electricity Supply). Article 20 of that document spells out the procedure directly: the new owner submits a written application within 15 days of the change of ownership, and the application must include the new buyer's first and last name (or company name), the basis for concluding the contract — that is, proof of title — as well as a JMBG or PIB number and a signature¹. The supplier is required to process the application within 5 days, requesting the meter reading from the network operator; the recorded reading becomes the closing figure for the previous owner and the opening figure for the new one¹. For a foreigner without a Montenegrin JMBG, the practical question of what to use instead of that number isn't directly addressed in the regulation; in practice it makes sense to check this directly with your local EPCG office, together with your passport number, but we did not find an unambiguous written rule on this point.

There's a separate, narrower situation — transferring the account after the previous owner's death: here heirs have 90 days to notify the supplier in writing and provide proof of title (list nepokretnosti) and the inheritance decision¹. This isn't the situation most buyers of a new-build apartment from a developer like Zen Gardens will run into, but it's worth knowing the difference in deadlines if you're buying on the resale market from heirs.

Water: same principle, different deadline

The water utility's procedure is similar in principle but shorter in timing. According to local outlet BARinfo, based on the water-supply decision in force in the Bar municipality, the user is obliged to report a change of ownership within 7 days of the change taking place³. The application must be accompanied by the sale-purchase contract or inheritance decision, proof of title (list nepokretnosti), confirmation of no outstanding debt, and the meter reading at the time of the request³. Until the re-registration is filed, Article 69 of the current water-supply decision formally keeps the payment obligation with the previous owner — meaning delays in transferring the account create a risk not just for the new owner, but for the seller as well³.

What happens if you delay the transfer

Two things are worth separating here: the legal obligation and the practical risk of disconnection. Under the water utility's rules, formal liability up until the application is filed rests with the previous owner³ — so in theory nothing threatens the buyer until the seller starts demanding the transfer happen. But in practice, leaving the meters “in the old name” is inconvenient and risky: online banking, e-bills and notifications about emergency shutoffs go to the previous owner's account, not yours, and if that person has already left Montenegro or changed their phone number, you may find out about a problem too late.

With electricity, there is at least one documented case where a failure to transfer a meter led to serious consequences: EPCG publicly announced a list of deceased meter owners and gave heirs 10 days to file an application and conclude a new contract — warning that it was prepared to disconnect metering points where this wasn't done². This specifically concerns inheritance, not an ordinary sale, and we found no direct confirmation that the same strict deadline applies to an ordinary transaction between living people — but the precedent itself shows that EPCG is, in principle, willing to go as far as disconnection when a meter stays legally “unclaimed” for too long.

Internet and connectivity: who's available on the coast

Several operators compete in Montenegro's fixed internet and TV market: Crnogorski Telekom (part of the Deutsche Telekom group) offers home internet with plans up to 4 Gbit/s and “internet + TV + mobile” bundles¹³, alongside Telemach and m:tel Crna Gora. None of the operators publishes an exact connection timeline for a new apartment on its public pages — Crnogorski Telekom's website limits itself to a general phrase about installation being “fast and simple,” with no specifics on days¹³. The practical takeaway: before buying equipment or planning your move, it's more reliable to check with your building manager or directly with the operator whether fiber has actually been run to your specific building — that determines both the available speed and the real connection timeline far more than general promises on a website.

Renovation without a permit — and renovation you must report

This is where the topic gets genuinely confusing, because the law distinguishes several degrees of intervention in a property, and they don't all require the same amount of paperwork. The current Law on the Construction of Facilities (Zakon o izgradnji objekata, as amended, current as of early 2026) provides formal definitions in Article 7. “Adaptation, i.e. renovation” is work carried out on an existing facility that changes the layout of a space or replaces equipment, installations and fittings, but does not affect the stability or safety of the building and does not alter its load-bearing structural elements⁴. “Reconstruction,” by contrast, is work on an existing facility within its previous horizontal and vertical dimensions that includes construction work forming a single functional or technical whole with the building, including structural renovation or the replacement of structural elements⁴.

In simpler terms: reconfiguring layout without demolishing load-bearing walls, replacing plumbing, wiring, flooring, doors, or a kitchen — that's adaptation. Removing or altering a load-bearing wall, work affecting the foundation, replacing the roof, or adding an extension — that's reconstruction, and it requires the same permits as new construction.

Adaptation or reconstruction: where the line falls
Adaptation — notification only
  • Replacing plumbing and wiring
  • New flooring, doors, kitchen
  • Reconfiguring layout without demolishing load-bearing walls
  • Replacing equipment and fittings
An application goes to the inspector (Art. 42); a full permit isn't required.
Reconstruction — a permit is required
  • Removing or altering a load-bearing wall
  • Work affecting the foundation
  • Replacing the roof
  • Extensions and additional storeys
The same permitting procedure as for new construction (Art. 33–34).

How the “prijava” works: not a permit, but its lighter version

For adaptation, the law does not require a full construction permit — instead, Article 42 describes a lighter notification procedure. The owner of the property is required to submit an application (“prijava”) to the building inspector for adaptation or renovation work, attaching a description of the planned work and an overview of the technical specifications of the materials to be used⁴. If, within 7 days of receiving the application, the inspector decides that the work described actually amounts to reconstruction, an extension, or an additional storey, the inspector must notify the applicant that they need to proceed under Articles 33 and 34 of the law — that is, go through the full construction-permit procedure, as for a new building⁴.

In practice, this means: even if you're certain you're just “doing a renovation,” you have a formal obligation to file a notification before work begins, and the final call on whether it's adaptation or reconstruction isn't yours to make — it's the inspector's. The sensible strategy is to file the notification in advance and wait out the seven-day response window, rather than starting work and hoping no one notices.

The price of silence: fines for unreported renovation

The fine for not reporting an adaptation to the inspector is not symbolic. According to a report by the Investitor.me outlet, citing the spatial-planning and construction legislation in force at the time, an unreported adaptation carries administrative liability in the form of a fine of €5,000 to €40,000 for a legal entity and €500 to €4,000 for an individual⁵. That figure dates to 2020 and to the previous version of the relevant law; we found no separate direct confirmation that these exact fine amounts carried over word-for-word into the current text of the Zakon o izgradnji objekata, but the current law itself confirms directly, in Article 42, that unreported adaptation is a punishable offense rather than a formality⁴. It's reasonable to assume the order of magnitude remains comparable, and not to treat the fine as a nominal sum you can ignore.

Who is actually entitled to call themselves a “majstor” in Montenegro

It's worth managing expectations here, especially if you've dealt with the craft-licensing system in Germany or Austria. Montenegro has no single mandatory state licensing system for residential renovation tradespeople — electricians, plumbers, tilers — working on the German “Meisterbrief” model. The licenses issued by the relevant ministry together with the Engineering Chamber of Montenegro (Inženjerska komora Crne Gore) belong to a different category — technical documentation, acting as the responsible person for construction, technical expertise and supervision — that is, they apply to large-scale projects and design documentation, not to residential renovation⁶.

The Chamber of Crafts of Montenegro (Zanatska komora Crne Gore) has recently started running its own “Montenegrin Master Craftsman Exam” (CMI), modeled on the German system and consisting of four parts — practical skills, technical theory, business and legal basics, and pedagogical training⁷. But the chamber itself states plainly that the decision to hand crafts official state authority in Montenegro has not yet been made — meaning passing this exam is a way to obtain an internationally recognized certificate and training, not a mandatory condition for legally working as a tradesperson in the country⁷. In other words: holding the certificate is a good sign when choosing a contractor, but not holding it doesn't mean you're dealing with someone unlicensed in the legal sense.

Where to find a contractor and how to vet reviews

Since the state licensing system for residential renovation isn't as strict as in Western Europe, reputation remains the main screening mechanism — and local online platforms help here. Meshtar.me is a Montenegrin marketplace connecting homeowners with tradespeople across more than a dozen categories, from plumbing and electrical work to tiling and roofing, in 24 towns across the country⁸. A key feature of the platform: only someone the tradesperson actually did work for can leave a review, which should reduce the share of inflated ratings⁸. Similar contractor directories operate under the names Samoruke.me and MojMajstor.me. None of these platforms substitutes for a state license — they're better thought of as a database of real client reviews, and their ratings should be treated accordingly: as one signal among several, not a guarantee.

Quote and receipt: how to tell a licensed tradesperson from a back-of-envelope estimate

Here the buyer of a service has real legal backing — the Law on Consumer Protection. Article 20 of the law requires anyone providing a renovation or maintenance service worth more than €40 to give the consumer a written offer with a specification — a description of the work, the materials needed, and the details of the job⁹. In practice, this means: if a tradesperson refuses to put the scope of work and materials in writing before starting a renovation costing more than forty euros, they're breaking the law, not just running an informal business. The same Article 20 also requires the service provider to issue the consumer a receipt with a specification of the work performed⁹ — meaning the right to a fiscal receipt is not a courtesy, it's part of the same basic legal norm.
There's also a practical benchmark for understanding the scale of your contractor's business: the mandatory VAT (PDV) registration threshold in Montenegro is €30,000 in annual turnover¹⁰. A tradesperson or small crew with turnover below that threshold most likely operates under the simplified flat-rate tax system and isn't required to be a VAT payer¹⁰ — that's normal and doesn't by itself signal anything illegal, but it means the invoice you're given may legally have no VAT line at all, rather than being missing a document you were owed.

Serbian language — a real advantage, but not the one you might think

Given how many Serbian-speaking readers take an interest in this particular renovation topic, it's worth closing off one tempting but unconfirmed line of thinking: since Serbia and Montenegro are so close culturally and linguistically, maybe it's easier for a Serbian citizen to hire “their own” workers or to get a job here without the usual formalities? We checked this directly against the official Montenegrin government page with information for foreigners on temporary residence and work — the document describes a single, unified permit procedure for all foreigners, with no exception by country of origin, requiring the applicant to prove financial means, health insurance, housing and a certificate of no criminal record from their home country¹¹. There is no separate simplified regime for Serbian citizens in this document.

What's more, in July 2026 Montenegrin media reported on an upcoming reform of the foreign-worker permit system that tightens, rather than loosens, oversight: no work permit will be issued without a positive opinion from the Employment Agency (Zavod za zapošljavanje), and employer data will now be cross-checked between the Tax Administration, the Health Insurance Fund, and the Labor Inspectorate¹². In other words, the trend is toward stricter, not more relaxed, hiring of foreign labor — regardless of which country in the region a worker comes from.

So where's the real practical advantage for a Serbian citizen, then? Not in labor law — in language. Serbian and Montenegrin are mutually intelligible without translation: you can personally read the written estimate discussed earlier, discuss the details of the work directly with the tradesperson, without a translator as intermediary and without the risk of a nuance getting lost in translation into German or Turkish. For a buyer from Germany or Turkey, that same estimate, receipt, and any complaint about the quality of the work all run into a language barrier that a Serbian-speaking buyer simply doesn't have.

There is, however, one narrow but confirmed exception specifically for Serbia — though it concerns diplomas, not work. The same official Montenegrin government page states plainly that diplomas issued in the Republic of Serbia before 25 January 2008, as well as in the former SFRY republics, are not subject to recognition — meaning they don't need to be separately legalized in Montenegro, unlike more recent Serbian diplomas and documents from most other countries¹¹. For the renovation topic, this is more of a curious detail than a practical tool: it concerns the recognition of educational credentials, not the right to work, and it applies only to diplomas issued before 2008.

A common mix-up: the right to buy an apartment is not the right to work here

It's worth spelling this out clearly, on a point we already touched on in our article on checking a property's legal status: a foreigner, including a citizen of Serbia, buys an apartment, house, or commercial space in Montenegro on the same terms as local citizens — there are no special barriers by nationality here. But it's easy to draw the wrong conclusion from this: that because buying property is so straightforward and free of citizenship discrimination, working in the country must be equally simple. These are two separate legal regimes that aren't connected to each other: property rights are governed by property law, while the right to work is governed by a separate Law on Foreigners, and as shown above, we found no exception for Serbian citizens here either¹¹. If you're planning not just to hire someone but to do renovation work yourself, as a foreigner without a work permit, in your own apartment, it's sensible to check this question with a local lawyer in advance rather than relying on an analogy with how easy it is to buy property.

Common mistakes

First — starting a renovation without notifying the inspector, on the assumption that “it's just an internal apartment renovation.” The law draws the line between adaptation and reconstruction not by a sense of scale, but by specific criteria — whether load-bearing structures are affected — and the final call belongs to the inspector, not to you.
Second — putting off transferring the meters “for later,” because the payments are being deducted just fine as it is. Not transferring the account doesn't remove the risk of disconnection and creates confusion around notifications and debts — the deadlines for EPCG and the water utility are different (15 and 7 days, respectively), and neither is worth missing.
Third — confusing reputation platforms like Meshtar.me with a state license, and not insisting on a written estimate for work over €40, even though the Law on Consumer Protection explicitly gives you the right to one.
Step-by-step plan for the first month
Right after registering your title in the cadastre, file the applications to transfer the meters — electricity within 15 days¹, water within 7 days³ — attaching the sale-purchase contract, proof of title, and an identity document. In parallel, check with your building manager or a telecom operator which internet provider is already connected to your building, so you don't waste time applying to providers with no technical capability there. If you're planning a renovation, work out for yourself (ideally with a specialist) whether the work falls under adaptation or reconstruction, and either way file the notification with the inspector before starting work, not after. When choosing a tradesperson, check reviews on platforms like Meshtar.me, always ask for a written estimate for work over €40, and make sure you're given a receipt once the job is done.
We've applied this same principle — checking specific conditions rather than general promises from blog posts — in our pieces on a non-resident account at a Montenegrin bank and cars and driving licenses in Montenegro. If you're already looking closely at the project, you can find the layouts and a contact card for questions on the project page.
What to do in the first month
1
Transfer the meters
Electricity — 15 days, water — 7 days. Attach the sale-purchase contract, proof of title, and an identity document.
2
Work out the type of renovation
Adaptation or reconstruction — this decides whether a simple notification or a full permit is needed. File it before work begins.
3
Find a tradesperson and check reviews
Platforms like Meshtar.me show only reviews from real clients — not a state license, but a real signal.
4
Get a written estimate and a receipt
For work over €40, a written estimate is a legal right, not a courtesy. A receipt is required regardless of the amount.
Same principle throughout: check the conditions for your specific case rather than relying on general promises from blogs.
Sources
  1. “Opšti uslovi za snabdijevanje električnom energijom” (General Terms for Electricity Supply), Regagen (Regulatorna agencija za energetiku i regulisane vodne usluge), regagen.co.me — Articles 20 (transfer on change of ownership, 15-day deadline) and 23 (transfer on inheritance, 90-day deadline).
  2. “Promjena imena kupca sa preminulih vlasnika brojila,” official EPCG (Elektroprivreda Crne Gore) statement, epcg.com/media-centar/saopstenja-za-javnost — warning of disconnection for failure to file within the set deadline; the case concerns inheritance, not an ordinary sale.
  3. “ViK: Zakonska obaveza prijave promjene vlasništva,” BARinfo, barinfo.me — the 7-day filing deadline, the list of required documents, and Article 69 of the water-supply decision on the previous owner's liability until the transfer is registered.
  4. Zakon o izgradnji objekata (current version, as amended; text published by the Secretariat for Spatial Planning and Environmental Protection of the Podgorica municipality), sekretarijat-za-ppor.podgorica.me — Article 7, items 1 and 17 (definitions of adaptation/renovation and reconstruction), Article 42 (the inspector-notification procedure and the inspector's powers).
  5. “Ko ne prijavi adaptaciju objekta kazna do 40.000 eura,” Investitor.me, 01.10.2020 — fine amounts are given per the legislation in force on the publication date; direct confirmation that the same amounts carried over into the current version of the law was not found.
  6. Page on licensing of construction activity, Engineering Chamber of Montenegro (Inženjerska komora Crne Gore), ingkomora.me.
  7. “Sve o majstorskom ispitu i pismu u Crnoj Gori,” Zanatska komora Crne Gore, zanapredak.jimdofree.com — description of the Crnogorski majstorski ispit (CMI) and the status of craft regulation as of the publication date.
  8. Official website of the Meshtar.me platform — description of the verified-review system and its coverage by city and work category.
  9. Zakon o zaštiti potrošača (Law on Consumer Protection), official text on the potrosac.me portal — Article 20 (written offer with a specification of work and materials for repair/maintenance services over €40; the same article also requires issuing a receipt with a specification of the work performed).
  10. Explainer on the VAT registration threshold and flat-rate taxation for small businesses, asistent.me/pausalnooporezivanje.html.
  11. “Informacije za strance — privremeni boravak i rad,” official portal of the Government of Montenegro, gov.me/clanak/184579 — the general permit procedure for foreigners, with no separate regime specified for Serbian citizens.
  12. “Crna Gora dobija novi sistem za strane radnike: Bez saglasnosti Zavoda nema dozvole,” Investitor.me, 24.07.2026 — description of the upcoming reform of the work-permit system for foreigners.
  13. “Fiksni internet” page, official Crnogorski Telekom website, telekom.me/privatni-korisnici/fiksni-internet — the range of plans and a general description of the connection process; exact installation timelines are not stated on the page.

Further Reading

Zen Gardens residential complex in Bar, Montenegro — facade and grounds
Zen Gardens, Bar — the Tomba district: 24 apartments, 65% of the plot given to living rather than to the building, and engineering designed for twelve months a year rather than three.

— Currency Control and Legal Payment in Montenegro — how to pay for a purchase — and other large expenses, including a renovation — without tripping currency-control rules.

— Mortgage in Montenegro for Foreigners: Real Rates — for anyone financing the purchase instead of paying by transfer in full.

— Cost of Living in Montenegro — a realistic monthly budget, so utility bills and renovation costs don’t come as a surprise.

— Car and Driving License in Montenegro — the other piece of bureaucracy that usually follows right after you settle into a new place.

— How to Get a Residence Permit in Montenegro — the general routes to a boravak for anyone relocating.

Read also
    PERSONAL PRESENTATION

    Do you want to understand if Zen Gardens is suitable for your lifestyle?

    During a personal online presentation with a project manager, you will:
    • Explore all available layouts and residence options
    • Discover interior design concepts and finishing styles
    • Learn more about the engineering solutions, infrastructure, and technologies of the complex
    • Receive a personalized residence selection based on your lifestyle and preferences
    • Get an individual price calculation and purchase conditions
    • Ask any questions directly to the project team
    Fill out the form below, and we will contact you to arrange a convenient time for your presentation.